Argus Projects
Argus handled hundreds of engineering projects and continues to support on of our nation’s premier railways. Argus Consulting was retained by one of North America’s premier railways for a three-year, on-call contract for engineering services for maintenance, inspections and emergency services and standards development for fueling facilities in the western and southern regions. This contract…
Argus analysis determined the need for a new oil water separator to minimize the risk of environmental non-compliance. Argus provided an analysis of potential causes of elevated oil and grease and BTEX levels in the industrial wastewater discharge from a railyard to the public sewer. The IWTP has a history of compliance and there have…
Technical support to owners and operators in a collaborative environment Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for the airlines’ fueling facilities at Sacramento International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to…
Replacing a 60+ year-old Industrial Wastewater Treatment Plant (IWTP) with a new state-of-the-art IWTP located away from the river. Argus Consulting has been retained to design the replacement for the locomotive fuel storage, pumping, piping and dispensing facility and the industrial wastewater treatment plant (IWTP). Argus is also providing permitting assistance. The fuel system will…
From master planning to system commissioning, Argus delivered the first major upgrades in more than 30 years for all system functions. The Metropolitan Nashville Airport Authority (MNAA) retained Argus Consulting for planning, design, construction, and resident engineering services to upgrade the airport fueling facilities that were constructed in the 1980s. Improvements were made to nearly…
Providing strategic support for the site’s long-range maintenance program, including tank inspections, coating evaluations and repairs. Argus Consulting provided Asset Integrity oversight services associated with the fuel systems at Phoenix Sky Harbor International Airport. Argus evaluated facility coatings and recommended repairs. Coating engineered life expectancy varies based on geographical regions, and due to the Arizona…
The airport’s existing fuel delivery system is maxed out, so Argus is working with the airlines to secure British Columbia’s role as “Canada’s Pacific Gateway” To ensure a long-term competitive fuel supply for the Vancouver International Airport, a consortium of airlines is building a new delivery system that includes a marine terminal and a fuel…
Float plane Jet-A fueling system at Harbour Air Seaplane Base in Vancouver, Canada Argus Consulting provided design and construction administration support to W.S. Nicholls Western Construction LTD for the installation of a three position Jet-A fueling system for the new Harbour Air Seaplane Base in downtown Vancouver near the Vancouver Convention Centre and Jack Poole…
Tank car diesel receipt and locomotive fueling facility for Class 1 railway Argus Consulting was retained to design and manage construction for a fuel receipt and fueling facility for a small station designed for maintenance and fueling of railroad snow removal locomotives and equipment in the Sierra Nevada mountains. This project included the controls, electrical…
The new system eliminates a 50+ year old refueling system and eliminates the potential for leaks and cleanup costs and treatment. Argus performed the Design/Bid/Build of a JP-8 Type III hydrant fuel system to support the A-10 Warthog hot refueling efforts at Davis-Monthan AFB. The new hydrant fueling system serves nine aircraft parking positions, each…