Project Services
Argus used a multi-disciplined team and its proprietary, tablet-based Facility Evaluation Assessment Tool (FEAT) to a generate an assessment report to inform the airport’s capital improvement program. Delta Airlines and the LGA Airport Fuel Consortium retained Argus Consulting to conduct a Fuel System Engineering Assessment of the existing tank farm. The study included evaluating the…
Excessive vibration is one of the main causes of failure, damage to fueling assets and incidents related to rotating equipment. Argus was retained to perform a Motion Amplification (MA) vibration analysis over all the pumps at the Nashville fuel facility. Argus performed analysis focusing on the coupling of several pumps to investigate any excessive vibration…
Community aviation, heating and auto fuel depot at Old Crow Airport in Yukon, Canada Old Crow is a community of 167 people located in Canada’s northern Yukon and it is only accessible via aircraft. Hence, all fuel, including heating oil, low sulfur diesel, unleaded gasoline, Avgas, and Jet-A, are all provided via aircraft delivery. Argus…
Located on the border with Mexico, demand for fuel had more than tripled at the airport in less than 10 years requiring a $1.36 million fuel system upgrade. South Texas International Airport at Edinburg (KEBG), located north of Edinburg, Texas, replaced the existing underground Avgas 100LL and Jet-A fuel storage tanks and bulk loading capabilities…
The two-tank system is based on industry-proven fuel systems developed by Argus Consulting. Argus provided design and construction services for a 12,000-gallon AVGAS fuel storage tank and 12,000-gallon JET-A fuel storage tank with 30 gpm over-wing self-service combined product dispensing skid at the El Reno Regional Airport in El Reno, Oklahoma. This project is in…
Argus met a tight timeline to deliver a new fuel rack and demolish the existing one without impacting completion of the terminal expansion. While most of DFW is serviced by an underground fuel hydrant system, refueler trucks are still needed for aircraft not parked at hydrant-accessible gates. The airport’s only jet refueler truck rack located…
Project phasing was complicated by work in the airfield operations area, avoiding the de-icing season, and the need to keep the existing fuel system active throughout construction. The Dallas Fort Worth International Airport is planning to expand the airfield ramp pavement off the southwest corner of existing Terminal D South Ramp to connect with the…
Charlotte Douglas will continue growing in the coming decades requiring significant expansion of fuel storage capabilities. The City of Charlotte has retained Argus Consulting for design, construction administration and resident engineering services for an expansion of airport fuel farm. The Fuel Farm development plan includes demolishing existing two 10,000-barrel Tanks and replacing them with one…
A challenging project that required construction of new facilities on the existing site while maintaining operations and resolution of prior subsurface environmental issues. Argus Consulting was selected to provide comprehensive planning, design, construction administration and resident engineering services for the new fuel receiving, storage and distribution facility and a 31-gate aircraft hydrant fueling system at…
Argus handled hundreds of engineering projects and continues to support on of our nation’s premier railways. Argus Consulting was retained by one of North America’s premier railways for a three-year, on-call contract for engineering services for maintenance, inspections and emergency services and standards development for fueling facilities in the western and southern regions. This contract…