Aviation

SJC Digital 3D As-Builts

Data from digital 3D As-Builts can be used for future design projects, engineering analysis, training, and inspection projects. Argus created 3D geometrical scans and 3D intelligent engineering models of the tanks, process equipment, piping system, and infrastructure within San Jose International Airport Fuel Facility and the remote truck rack. The LiDAR scans were used to…

LAS LVA Pipeline – Harry Reid International Airport

Providing infrastructure improvements at Harry Reid International’s two fuel storage facilities to support increased receiving capacity for future demand in Las Vegas. With our clients, local government partners and industry peers, Argus Consulting recently celebrated the commissioning of the pipeline with a ribbon cutting ceremony. Fuel had previously been delivered to the Las Vegas metroplex via…

FLL Tank Farm Expansion

Argus performs significant upgrades for 35-year-old fuel facility The Ft. Lauderdale Fuel Facilities consortium retained Argus Consulting for master planning, design, construction administration and resident engineering services for significant upgrades and expansion to the fuel storage facility at Fort Lauderdale-Hollywood International Airport originally built in 1986. Argus has designed improvements to nearly all fuel system…

CLT Fuel Farm Expansion

The City of Charlotte Master Plan calls for a phased development program for the Fuel Farm to ensure the fueling infrastructure continues to support the growing airport into the future. The City of Charlotte has retained Argus Consulting for design, construction administration and resident engineering services for an expansion of Charlotte-Douglas International Airport fuel farm.…

ORD Master Planning and Master Engineer

Argus contributes to O’Hare’s largest terminal revamp in its 73-year history. Argus has been retained by the O’Hare Fuel Committee as the City of Chicago prepares to undergo the single largest, most expensive terminal revamp in the 73-year history of Chicago O’Hare International Airport. In 2002, the Chicago Department of Aviation (CDA) conducted an airport…

LGA Programing and Owners Rep

An exciting first step in the modernization of fuel delivery at LGA providing increased reliability and capacity. Argus Consulting was retained for program management and owner’s representative services for the construction of a fuel transmission system to connect the existing tank farm and terminals currently under development by LaGuardia Gateway Partners (LGAP, Terminal B) and…

BNA Engineering Support Services

Providing on-call support for Nashville International Airport Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for the airlines’ fueling facilities at Nashville International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to improve overall facility…

MCI New Terminal Hydrant Fueling System

Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…

JFK Bulk Fuel Farm Expansion

From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…

BWI Engineering Support Services

Always-on support for Baltimore-Washington International Airport Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for Southwest’s fueling facilities at Baltimore-Washington International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to improve overall facility performance, extend…