Argus Projects

LGA Programing and Owners Rep

An exciting first step in the modernization of fuel delivery at LGA providing increased reliability and capacity. Argus Consulting was retained for program management and owner’s representative services for the construction of a fuel transmission system to connect the existing tank farm and terminals currently under development by LaGuardia Gateway Partners (LGAP, Terminal B) and…

BNA Engineering Support Services

Providing on-call support for Nashville International Airport Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for the airlines’ fueling facilities at Nashville International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to improve overall facility…

Lake Havasu Marina Fueling System

Design and construction support services to fuel a large marina in the heart of Lake Havasu Lake Havasu is a large reservoir behind Parker Dam on the Colorado River on the border between Arizona and California. The Chemehuevi Indian Tribe has built a new marina at the Havasu Landing Resort and Casino that includes a…

Tuwaiq KSA POL Facility

Fuels engineering support for multi-mission surface combatant ships at King Abdulaziz Naval Base in Saudi Arabia The Kingdom of Saudi Arabia (KSA), on behalf of the Royal Saudi Naval Forces (RSNF) and the US Government (USG), implemented various Foreign Military Sales (FMS) to provide for the purchase, deployment, and support of Tuwaiq Ships. Argus was…

MCI New Terminal Hydrant Fueling System

Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…

JFK Bulk Fuel Farm Expansion

From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…

BWI Engineering Support Services

Always-on support for Baltimore-Washington International Airport Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for Southwest’s fueling facilities at Baltimore-Washington International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to improve overall facility performance, extend…

Rental Car Fuel Facilities Tank Replacement at Columbia Metropolitan Airport

Our facility assessment provided options for replacing underground fuel storage with aboveground fuel facilities that are compliant and cost effective. Argus Consulting has been retained for planning, design, bidding and construction administration for a new fuel system at the rental car facilities supporting Columbia Metropolitan Airport. In 2017, Argus conducted an analysis of the existing…

Charleston and Tampa DFSP Digital As-Builts

The Defense Fuel Supply Points (DFSP) at Charleston and Tampa needed As-Built documents to improve efficiency for engineering design services, training, maintenance planning and inspection projects. Using the latest Reverse Engineering technologies, Argus collected the as-built geometrical data to create 3D intelligent models, drawings and equipment specifications for the fuel receiving and fuel storage facilities…

FLL Terminal Fuel Line Expansion

A new international terminal at Fort Lauderdale-Hollywood International Airport required a new aircraft fueling hydrant system and relocating numerous hydrant pits. Argus Consulting provided fuel system design services and construction oversight of the hydrant fueling system expansion at FLL to serve Southwest Airlines’ new International Terminal. This project included design of the new five gate…