Engineering

SMF Tank Farm Expansion – Design, Construction Administration, and Resident Engineering Services

The SMF Fuel Consortium retained Argus Consulting for design, permitting, bidding, Issued for construction (IFC) documents, construction administration, and resident representative services for the Sacramento International Airport (SMF) tank farm expansion to support increased airport traffic and SMForward, the airport’s $1.3 billion modernization and expansion project. SMF served a record number of 1.3 million passengers…

Orlando (MCO) Firefighting Foam and Fire Protection System Transition

Orlando Fuel Facilities has retained Argus Consulting to support the Orlando International Airport (MCO) fuel facility in their transition from using aqueous film-forming foam (AFFF) containing harmful per- and polyfluoroalkyl substances (PFAS) to fluorine-free foam (F3) concentrates. These updates will allow the airport fuel facility to meet upcoming PFAS regulations while minimizing environmental impact, safety…

William P. Hobby Airport (HOU) Fuel Storage Facilities and Pipeline Expansion

Significant Improvements for Efficient Fueling Operations Argus provided comprehensive study, planning, design, bidding, permitting, construction support, and resident engineering services for 21st-century fuel delivery and storage facilities at the William P. Hobby Airport (HOU), the international airport located in Houston, TX, also known as Houston Hobby. Opportunity The pipeline delivery was terminated by its previous…

Sedona Airport (SEZ) Fuel Storage Facility Upgrade

Elevating Operational Excellence with Fuel System Modernization In a strategic move to enhance operational efficiency and safety, Sedona Airport (SEZ) in Sedona, AZ, embarked on a significant infrastructure upgrade with the development of a new JET A and AVGAS 100LL Bulk Storage Facility. Recognizing the need for modernization, the airport partnered with Argus Consulting to…

KRBO New AVGAS 100LL and Jet-A Storage and Dispensing Facility

KRBO – Nueces County Airport – New AVGAS 100LL and JET-A Storage and Dispensing Facility The two-tank system is based on industry-proven fuel systems developed by Argus Consulting. Argus provided design, bidding, and construction support services for a new fuel storage and dispensing system at the Nueces County Airport in Robstown, TX. The overall project…

Ribbon Cutting Celebrates the Completion of the Much-Anticipated LASFuel LVA Pipeline at Harry Reid International Airport

Ribbon Cutting Celebrates the Completion of the Much-Anticipated LASFuel LVA Pipeline at Harry Reid International Airport As part of the 2022 annual LASFUEL consortium meeting, key project leaders involved in the planning, funding, design, permitting, and construction of the LVA Pipeline gathered to celebrate the completion of the new strategic infrastructure supplying jet fuel to…

Rail Locomotive Diesel Shop Oil Piping Replacement and Upgrades

Enhancing user-friendly operations and providing a safer working environment Argus provided design and construction administration for upgrades to the lube oil and used oil piping systems in the diesel shop for enhanced user-friendly operations and a safer working environment. This project replaced most of the lube oil collection and distribution piping in the eight-track maintenance…

KFBL Fuel Storage and Dispensing System

Designing fuel storage tanks and over-wing dispenser system to make it easy to fuel up and fly Argus was retained for design, bidding phase services and construction support of a new aboveground fuel storage and over-wing self-service dispensing system for Jet A and AVGAS fuel at the Faribault Municipal Airport in Minnesota. The new facility…

LAS LVA Pipeline – Harry Reid International Airport

Providing infrastructure improvements at Harry Reid International’s two fuel storage facilities to support increased receiving capacity for future demand in Las Vegas. With our clients, local government partners and industry peers, Argus Consulting recently celebrated the commissioning of the pipeline with a ribbon cutting ceremony. Fuel had previously been delivered to the Las Vegas metroplex via…

FLL Tank Farm Expansion

Argus performs significant upgrades for 35-year-old fuel facility The Ft. Lauderdale Fuel Facilities consortium retained Argus Consulting for master planning, design, construction administration and resident engineering services for significant upgrades and expansion to the fuel storage facility at Fort Lauderdale-Hollywood International Airport originally built in 1986. Argus has designed improvements to nearly all fuel system…