Engineering

ORD Master Planning and Master Engineer

Argus contributes to O’Hare’s largest terminal revamp in its 73-year history. Argus has been retained by the O’Hare Fuel Committee as the City of Chicago prepares to undergo the single largest, most expensive terminal revamp in the 73-year history of Chicago O’Hare International Airport. In 2002, the Chicago Department of Aviation (CDA) conducted an airport…

Read More

LGA Programing and Owners Rep

An exciting first step in the modernization of fuel delivery at LGA providing increased reliability and capacity. Argus Consulting was retained for program management and owner’s representative services for the construction of a fuel transmission system to connect the existing tank farm and terminals currently under development by LaGuardia Gateway Partners (LGAP, Terminal B) and…

Read More

Lake Havasu Marina Fueling System

Design and construction support services to fuel a large marina in the heart of Lake Havasu Lake Havasu is a large reservoir behind Parker Dam on the Colorado River on the border between Arizona and California. The Chemehuevi Indian Tribe has built a new marina at the Havasu Landing Resort and Casino that includes a…

Read More

Tuwaiq KSA POL Facility

Fuels engineering support for multi-mission surface combatant ships at King Abdulaziz Naval Base in Saudi Arabia The Kingdom of Saudi Arabia (KSA), on behalf of the Royal Saudi Naval Forces (RSNF) and the US Government (USG), implemented various Foreign Military Sales (FMS) to provide for the purchase, deployment, and support of Tuwaiq Ships. Argus was…

Read More

MCI New Terminal Hydrant Fueling System

Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…

Read More

JFK Bulk Fuel Farm Expansion

From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…

Read More
System Analysis

Rental Car Fuel Facilities Tank Replacement at Columbia Metropolitan Airport

Our facility assessment provided options for replacing underground fuel storage with aboveground fuel facilities that are compliant and cost effective. Argus Consulting has been retained for planning, design, bidding and construction administration for a new fuel system at the rental car facilities supporting Columbia Metropolitan Airport. In 2017, Argus conducted an analysis of the existing…

Read More

FLL Terminal Fuel Line Expansion

A new international terminal at Fort Lauderdale-Hollywood International Airport required a new aircraft fueling hydrant system and relocating numerous hydrant pits. Argus Consulting provided fuel system design services and construction oversight of the hydrant fueling system expansion at FLL to serve Southwest Airlines’ new International Terminal. This project included design of the new five gate…

Read More

EWR Terminal A Hydrant System Study

As the Port Authority of New York and New Jersey prepared for a new terminal at Newark’s International Airport, Argus studied the best options for fueling aircraft. Argus Consulting provided Stage 1 reports and concept designs for fueling infrastructure improvements as the Port Authority of New York and New Jersey was in the planning stages…

Read More

DFW Capital Development Program

Argus has provided fueling and environmental services for DFW starting as a member of the 2000 Capital Development Program team. As we started the 21st century, the DFW Airport Board launched a comprehensive $2.7 billion multi-year Capital Development Program. This 10-year program included the construction of the new passenger terminal, parking structures, roadways, infrastructure systems…

Read More