Argus Projects

DFW Truck Load Rack

Argus met a tight timeline to deliver a new fuel rack and demolish the existing one without impacting completion of the terminal expansion. While most of DFW is serviced by an underground fuel hydrant system, refueler trucks are still needed for aircraft not parked at hydrant-accessible gates. The airport’s only jet refueler truck rack located…

Read More

DFW Ramp Expansion Hydrant Fueling

Project phasing was complicated by work in the airfield operations area, avoiding the de-icing season, and the need to keep the existing fuel system active throughout construction. The Dallas Fort Worth International Airport is planning to expand the airfield ramp pavement off the southwest corner of existing Terminal D South Ramp to connect with the…

Read More

CLT Fuel Farm Expansion

Charlotte Douglas will continue growing in the coming decades requiring significant expansion of fuel storage capabilities. The City of Charlotte has retained Argus Consulting for design, construction administration and resident engineering services for an expansion of airport fuel farm. The Fuel Farm development plan includes demolishing existing two 10,000-barrel Tanks and replacing them with one…

Read More

BWI New Tank Farm and Hydrant Fueling System

A challenging project that required construction of new facilities on the existing site while maintaining operations and resolution of prior subsurface environmental issues. Argus Consulting was selected to provide comprehensive planning, design, construction administration and resident engineering services for the new fuel receiving, storage and distribution facility and a 31-gate aircraft hydrant fueling system at…

Read More

Railroad On-Call Engineering

Argus handled hundreds of engineering projects and continues to support on of our nation’s premier railways. Argus Consulting was retained by one of North America’s premier railways for a three-year, on-call contract for engineering services for maintenance, inspections and emergency services and standards development for fueling facilities in the western and southern regions. This contract…

Read More

OWS Replacement for Class 1 Railway

Argus analysis determined the need for a new oil water separator to minimize the risk of environmental non-compliance. Argus provided an analysis of potential causes of elevated oil and grease and BTEX levels in the industrial wastewater discharge from a railyard to the public sewer. The IWTP has a history of compliance and there have…

Read More

SMF Engineering Support Services

Technical support to owners and operators in a collaborative environment Argus Consulting has an on-call contract for engineering support services for maintenance, inspections, and emergency services for the airlines’ fueling facilities at Sacramento International Airport. The goal of the program is to provide technical support to the owner and operator in a collaborative environment to…

Read More

Rail Fuel Facility & Industrial Wastewater Plant

Replacing a 60+ year-old Industrial Wastewater Treatment Plant (IWTP) with a new state-of-the-art IWTP located away from the river. Argus Consulting has been retained to design the replacement for the locomotive fuel storage, pumping, piping and dispensing facility and the industrial wastewater treatment plant (IWTP). Argus is also providing permitting assistance. The fuel system will…

Read More

BNA Fuel System Upgrades

From master planning to system commissioning, Argus delivered the first major upgrades in more than 30 years for all system functions.  The Metropolitan Nashville Airport Authority (MNAA) retained Argus Consulting for planning, design, construction, and resident engineering services to upgrade the airport fueling facilities that were constructed in the 1980s. Improvements were made to nearly…

Read More

PHX Asset Integrity Services

Providing strategic support for the site’s long-range maintenance program, including tank inspections, coating evaluations and repairs. Argus Consulting provided Asset Integrity oversight services associated with the fuel systems at Phoenix Sky Harbor International Airport. Argus evaluated facility coatings and recommended repairs. Coating engineered life expectancy varies based on geographical regions, and due to the Arizona…

Read More