Engineering
The City of Charlotte Master Plan calls for a phased development program for the Fuel Farm to ensure the fueling infrastructure continues to support the growing airport into the future. The City of Charlotte has retained Argus Consulting for design, construction administration and resident engineering services for an expansion of Charlotte-Douglas International Airport fuel farm.…
Argus contributes to O’Hare’s largest terminal revamp in its 73-year history. Argus has been retained by the O’Hare Fuel Committee as the City of Chicago prepares to undergo the single largest, most expensive terminal revamp in the 73-year history of Chicago O’Hare International Airport. In 2002, the Chicago Department of Aviation (CDA) conducted an airport…
An exciting first step in the modernization of fuel delivery at LGA providing increased reliability and capacity. Argus Consulting was retained for program management and owner’s representative services for the construction of a fuel transmission system to connect the existing tank farm and terminals currently under development by LaGuardia Gateway Partners (LGAP, Terminal B) and…
Design and construction support services to fuel a large marina in the heart of Lake Havasu Lake Havasu is a large reservoir behind Parker Dam on the Colorado River on the border between Arizona and California. The Chemehuevi Indian Tribe has built a new marina at the Havasu Landing Resort and Casino that includes a…
Fuels engineering support for multi-mission surface combatant ships at King Abdulaziz Naval Base in Saudi Arabia The Kingdom of Saudi Arabia (KSA), on behalf of the Royal Saudi Naval Forces (RSNF) and the US Government (USG), implemented various Foreign Military Sales (FMS) to provide for the purchase, deployment, and support of Tuwaiq Ships. Argus was…
Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…
From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…
Our facility assessment provided options for replacing underground fuel storage with aboveground fuel facilities that are compliant and cost effective. Argus Consulting has been retained for planning, design, bidding and construction administration for a new fuel system at the rental car facilities supporting Columbia Metropolitan Airport. In 2017, Argus conducted an analysis of the existing…
A new international terminal at Fort Lauderdale-Hollywood International Airport required a new aircraft fueling hydrant system and relocating numerous hydrant pits. Argus Consulting provided fuel system design services and construction oversight of the hydrant fueling system expansion at FLL to serve Southwest Airlines’ new International Terminal. This project included design of the new five gate…
As the Port Authority of New York and New Jersey prepared for a new terminal at Newark’s International Airport, Argus studied the best options for fueling aircraft. Argus Consulting provided Stage 1 reports and concept designs for fueling infrastructure improvements as the Port Authority of New York and New Jersey was in the planning stages…