Construction Management

Rail Locomotive Diesel Shop Oil Piping Replacement and Upgrades

Enhancing user-friendly operations and providing a safer working environment Argus provided design and construction administration for upgrades to the lube oil and used oil piping systems in the diesel shop for enhanced user-friendly operations and a safer working environment. This project replaced most of the lube oil collection and distribution piping in the eight-track maintenance…

KFBL Fuel Storage and Dispensing System

Designing fuel storage tanks and over-wing dispenser system to make it easy to fuel up and fly Argus was retained for design, bidding phase services and construction support of a new aboveground fuel storage and over-wing self-service dispensing system for Jet A and AVGAS fuel at the Faribault Municipal Airport in Minnesota. The new facility…

Lake Havasu Marina Fueling System

Design and construction support services to fuel a large marina in the heart of Lake Havasu Lake Havasu is a large reservoir behind Parker Dam on the Colorado River on the border between Arizona and California. The Chemehuevi Indian Tribe has built a new marina at the Havasu Landing Resort and Casino that includes a…

MCI New Terminal Hydrant Fueling System

Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…

JFK Bulk Fuel Farm Expansion

From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…

Rental Car Fuel Facilities Tank Replacement at Columbia Metropolitan Airport

Our facility assessment provided options for replacing underground fuel storage with aboveground fuel facilities that are compliant and cost effective. Argus Consulting has been retained for planning, design, bidding and construction administration for a new fuel system at the rental car facilities supporting Columbia Metropolitan Airport. In 2017, Argus conducted an analysis of the existing…

FLL Terminal Fuel Line Expansion

A new international terminal at Fort Lauderdale-Hollywood International Airport required a new aircraft fueling hydrant system and relocating numerous hydrant pits. Argus Consulting provided fuel system design services and construction oversight of the hydrant fueling system expansion at FLL to serve Southwest Airlines’ new International Terminal. This project included design of the new five gate…

EWR Terminal A Hydrant System Study

As the Port Authority of New York and New Jersey prepared for a new terminal at Newark’s International Airport, Argus studied the best options for fueling aircraft. Argus Consulting provided Stage 1 reports and concept designs for fueling infrastructure improvements as the Port Authority of New York and New Jersey was in the planning stages…

DFW Capital Development Program

Argus has provided fueling and environmental services for DFW starting as a member of the 2000 Capital Development Program team. As we started the 21st century, the DFW Airport Board launched a comprehensive $2.7 billion multi-year Capital Development Program. This 10-year program included the construction of the new passenger terminal, parking structures, roadways, infrastructure systems…

DFW Hydrant System Modifications

From 2010 to 2017 DFW Airport renewed its original terminals that were opened 35 years earlier. DFW Airport kicked off a seven-year Terminal Renewal and Improvement Program (TRIP) in 2010 to renew all of its original terminals – A, B,C and E. The terminal building systems, opened in 1974, have reached the end of their…